Instrumentation Supervisor focused on safe, accurate geotechnical monitoring.

Hands-on experience installing and monitoring instruments — inclinometers, piezometers, extensometers, tilt plates, settlement markers and more. Strong reporting discipline (daily/weekly/monthly) and vibration monitoring using Blastware.

Get in touch Download CV

About

I am an Instrumentation Supervisor with practical experience on major underground and high-speed rail projects (NHSRCL MAHSR, DMRC Phase-IV). I specialise in installation, maintenance and monitoring of geotechnical instruments and producing accurate reports for site teams and stakeholders.

Experience

Energetic People Pvt. Ltd. (undertaken by Megha Engineering & Infrastructures Ltd.)

Instrumentation Supervisor — 5 August 2024 to Present

Project: NHSRCL — MAHSR Package C-1 (hover or click to expand)

Site: BKC, Mumbai

Owner: National High-Speed Rail Corporation Limited

Contractor: MEIL-HCC JV

Description: Design and construction of civil and building works including testing and commissioning for the double-line high-speed railway for Mumbai Underground Station, Cut & Cover Tunnel, and Shaft-1 from MAHSR KM -0.255 to KM 0.775 at Bandra-Kurla Complex, Maharashtra.

  • Installed and monitored geotechnical instruments (inclinometers, piezometers, extensometers, etc.)
  • Prepared daily, weekly, and monthly reports including vibration monitoring using Blastware.
  • Supervised helpers and coordinated with site engineers and contractors.

SS Geotech Instrumentation & Monitoring

Instrumentation Supervisor — 7 November 2023 to 3 August 2024

Project: DMRC — MRTS PH-IV DC-08 (hover or click to expand)

Site: Vasant Kunj, Delhi

Owner: Delhi Metro Corporation Limited

Contractor: JKumar Infraprojects Limited

Description: Design and construction of twin tunnel (up & down line) by Shield TBM, Cut and Cover Tunnel Box and four underground stations namely Aerocity, Mahipalpur, Vasant Kunj, and Kishangarh with entry/exits & connecting subways from chainage (-) 760 MT. to 5356.285 MT. of Aerocity to Tughlaqabad Corridor of Phase-IV of Delhi MRTS.

  • Worked on twin tunnel Shield TBM and cut-and-cover tunnels for multiple underground stations.
  • Installed instruments and produced daily/monthly reports; coordinated instrument monitoring and site requirements.

Education

High School

D.T.E.A Sr. Sec. School, Lodhi Estate, New Delhi — CBSE, 2020

Intermediate

D.T.E.A Sr. Sec. School, Lodhi Estate, New Delhi — CBSE, 2022

Skills

Contact

If you'd like to work together or request my full CV, email me or call directly.